Our website is made possible by displaying online advertisements to our visitors.Please consider supporting us by disabling your ad blocker.
Drop Down MenusCSS Drop Down MenuPure CSS Dropdown Menu
Drop Down MenusCSS Drop Down MenuPure CSS Dropdown Menu

Translate it in your own Language

Print this Job Post

Print Friendly and PDF

Thursday, May 15, 2014

CGI Paper-6


PAGE:6



CGI Quantitative Aptitude Section:

1. Data sufficiency. there were about 15 questions of the type A question is given with 2 options. U have 2 conclude ans can be determined by only option 1 or 2 or both or both r insufficient.

2. Data interpretation. This was dam tough. U have to manipulate a graph and answer about 12 questions. there were also thequestions on graphs and tables.

3. Contractor has 2 complete work within a fixed time. If he is late he has to pay fine. The first day it is Rs 200 and from then on it increases by 25 per day. He has to pay Rs 9450. How many days he got late.

Ans is 21.

4. Sphere of diameter 6 cm is melted to form a cone with diameter 12 cm. Find height of cone.

5. Shakuntala devi sum of the number of glasses received intact.

6. Sum on Cisterns, Pipes a, B and C r there a and b can fill the tank in 4 and 5 hours respectively. C can empty tank in 2 hours. If the pipes were opened at 1.00 and 2.00 am successively by what time will the tank be empty.

7. a question 
on cost of painted area.

8. A brick size is 8″ x 6″. An L shaped wall has to be built with width of 4, other two dimmensions are 21 and 7. Find no of Bricks reqd.

9. Ratio of base and heights of a cone and cylinder is given. Find ratio of their curved surfaces.

CGI 
Technical Section:

1. ——— acts as a command interpreter



A) Unix shell b) kernel c) d) ans) a

2. Combine $x=1;[x -ge 10] into a single statement

3. Wats the output of 
the code snippet

echo hello

Eval echo Hello

Eval echo eval Hello

Ans: hello

Hello

Hello

4. What does $* represent

5. Which statement is true to dbms?

a) Collection of data

b) Collection of interrelated data and set of programs to access that data

c) Collection of inter related data no need of any programs

d) Collection of data and set of programs

Ans) b

6. Values should dependant on primary key in which normal form?

a) 1 NF b) 2nf c) 3nf d) 4nf

7. Mathematical representation of joining tables ———-

a) Union b) c) Cartesian product d)

8. Question on data objects and constraints

9. Use of normalization?

a) Reducing redundancy b) little storage space c) d) all the above

ANS)d

10. What r the types of joins below

A) Interior & outer b) inner and outer joins c) d)

Ans) b

11. C++ —15 q(15 min)

The code that could be written in which block to raise exceptions?

A) Catch b) try c) finally d) none

Ans) b  


his was especially for the mainframes and they had stressed on CICS.

The paper is divided in 2 sections:

1: Verbal

2: 
quantitative.

The test is of 1 hour and 15 minutes duration.

Verbal:

1. U have 
to point grammatical errors, about 10 were there.

2. U have to fill the blanks with correct options about 20.

3. a comprehension and 12 questions.

Quantitative:

1. Data sufficiency. there were about 15 questions of the type A 
question is given with 2 options. U have 2 conclude ans can be determined by only option 1 or 2 or both or both r insufficient.

2. Data interpretation. This was dam tough. U have to manipulate a graph and 
answer about 12 questions. there were also thequestions on graphs and tables.

3.  Contractor has 2 complete work within a fixed time. If he is late he has to pay fine. The first day it is Rs 200 and from then on it increases by 25 per day. He has to pay Rs 9450. How many days he got late.

Ans is 21.

4. Sphere of diameter 6 cm is melted to form a cone with diameter 12 cm. Find height of cone.

5. Shakuntala devi sum of the number of glasses received intact.

6. Sum on Cisterns, Pipes a, B and C r there a and b can fill the tank in 4 and 5 hours respectively. C can empty tank in 2 hours. If the pipes were opened at 1.00 and 2.00 am successively by what time will the tank be empty.

7. a question 
on cost of painted area.

8. A brick size is 8" x 6". An L shaped wall has to be built with width of 4, other two dimmensions are 21 and 7. Find no of Bricks reqd.

9.
 Ratio of base and heights of a cone and cylinder is given. Find ratio of their curved surfaces.



            « Prev 1234567 Next »




No comments:

Post a Comment

Copyright @ CrackMNC 2014-2024
Divas Nikhra Theme by Crack MNC